From breakdown to benchmark: the Koingnaas diamond plant
A plant that broke more than it ran, turned around in one operating year with visual work management, Pareto focus, FMECA and the courage to take a plant back to basics.
New Vaal: 120,000-hour haul trucks to 90%-plus reliability As told by Steve Möller
The Divisional Engineer behind Koingnaas applied the same principles to a worn Hitachi haul-truck fleet — proving the method is asset-agnostic.
When “bearing replaced” is not a root cause
A conveyor take-up bearing caught fire and the report closed at “bearing replaced” — within hours. The five-why chain the event deserved, and the strategy that prevents the repeat.
When the analysis stops: the RCFA the boardroom killed
A sound silo-failure investigation that died at the verification step — because leadership expected a silver bullet, not a method. The honest case study most consultancies won’t publish.